NEM
coalgashydrobattery dischargewindsolar utilitysolar rooftopBattery (charge) coalgashydrobattery dischargewindsolar utilitysolar rooftopBattery (charge) coalgashydrobattery dischargewindsolar utilitysolar rooftopBattery (charge) gasbattery dischargewindsolar utilitysolar rooftopBattery (charge) hydrowindsolar rooftop
NEM
Daily analysis
Friday 15 May 2026
Trading day 2026-05-15
Prices
Trading day · 04:00 → 04:00 AEST
NSW VIC QLD SA TAS
| Region | Avg | VWAP | Min | Max | Neg | Cap |
|---|---|---|---|---|---|---|
| NSW | $59 | $60 | $10 | $100 | 0 | 0 |
| QLD | $58 | $61 | -$2 | $102 | 0 | 0 |
| SA | $42 | $43 | -$5 | $113 | 3 | 0 |
| VIC | $34 | $37 | -$27 | $91 | 11 | 0 |
| TAS | $93 | $93 | $60 | $139 | 0 | 0 |
Demand
NSW
Peak
9,112MW
17:55
Trough
6,292MW
04:00
Energy
365.4GWh
QLD
Peak
7,513MW
17:50
Trough
4,605MW
10:35
Energy
288.6GWh
SA
Peak
1,798MW
18:10
Trough
1,226MW
04:00
Energy
73.0GWh
VIC
Peak
6,406MW
07:45
Trough
3,733MW
12:55
Energy
236.2GWh
TAS
Peak
1,301MW
07:55
Trough
908MW
02:40
Energy
51.3GWh
Generation Mix
- Coal62.7% · 123.8 GWh
- Gas0.5% · 1.1 GWh
- Hydro3.7% · 7.2 GWh
- Wind10.2% · 20.2 GWh
- Solar (utility)11.7% · 23.0 GWh
- Solar (rooftop)9.4% · 18.5 GWh
- Battery1.9% · 3.7 GWh
- Coal52.8% · 97.4 GWh
- Gas3.7% · 6.8 GWh
- Hydro3.0% · 5.6 GWh
- Wind15.2% · 28.1 GWh
- Solar (utility)10.5% · 19.4 GWh
- Solar (rooftop)12.4% · 22.8 GWh
- Battery2.3% · 4.3 GWh
- Coal49.8% · 78.6 GWh
- Gas0.2% · 0.4 GWh
- Hydro2.7% · 4.3 GWh
- Wind32.4% · 51.2 GWh
- Solar (utility)3.3% · 5.2 GWh
- Solar (rooftop)9.1% · 14.3 GWh
- Battery2.5% · 3.9 GWh
- Gas3.9% · 1.9 GWh
- Wind86.2% · 40.8 GWh
- Solar (utility)2.0% · 1.0 GWh
- Solar (rooftop)4.8% · 2.3 GWh
- Battery3.1% · 1.5 GWh
- Hydro76.9% · 20.0 GWh
- Wind20.0% · 5.2 GWh
- Solar (rooftop)3.1% · 0.8 GWh
Renewables
NSW · Daily renewable share
27.7%
VIC · Daily renewable share
48.6%
QLD · Daily renewable share
37.0%
SA · Daily renewable share
109.6%
TAS · Daily renewable share
88.5%
Peak instantaneous
57.9%
at 11:20
Daily NEM-wide share
44.3%
By region (daily share)
- NSW 27.7%
- VIC 48.6%
- QLD 37.0%
- SA 109.6%
- TAS 88.5%
FCAS
| Service | Cost | Spikes | Peak | When |
|---|---|---|---|---|
| RAISEREG | $6,638 | 0 | $15 | 15 May, 16:10 |
| LOWERREG | $1,751 | 0 | $16 | 15 May, 14:30 |
| RAISE6SEC | $233 | 0 | $0 | 15 May, 07:15 |
| RAISE60SEC | $221 | 0 | $0 | 15 May, 07:15 |
| LOWER60SEC | $190 | 0 | $1 | 15 May, 14:40 |
| LOWER5MIN | $111 | 0 | $0 | 15 May, 15:00 |
| LOWER6SEC | $96 | 0 | $1 | 15 May, 15:00 |
| RAISE5MIN | $67 | 0 | $0 | 15 May, 09:30 |
| Total | $9,306 | |||
Cost = NSW RRP × cleared MW per 5-min interval.
| Service | Cost | Spikes | Peak | When |
|---|---|---|---|---|
| LOWER60SEC | $22,384 | 0 | $11 | 15 May, 09:35 |
| LOWER6SEC | $20,886 | 0 | $9 | 15 May, 10:45 |
| LOWER5MIN | $7,805 | 0 | $6 | 15 May, 09:05 |
| RAISEREG | $5,703 | 0 | $15 | 15 May, 16:10 |
| LOWERREG | $2,881 | 0 | $16 | 15 May, 14:30 |
| RAISE6SEC | $375 | 0 | $0 | 15 May, 17:00 |
| RAISE60SEC | $291 | 0 | $0 | 15 May, 17:10 |
| RAISE5MIN | $83 | 0 | $0 | 15 May, 19:35 |
| Total | $60,408 | |||
Cost = QLD RRP × cleared MW per 5-min interval.
| Service | Cost | Spikes | Peak | When |
|---|---|---|---|---|
| RAISEREG | $12,995 | 0 | $15 | 15 May, 16:10 |
| LOWERREG | $4,546 | 0 | $16 | 15 May, 14:30 |
| RAISE60SEC | $385 | 0 | $0 | 15 May, 07:15 |
| RAISE6SEC | $301 | 0 | $0 | 15 May, 07:15 |
| LOWER60SEC | $203 | 0 | $1 | 15 May, 14:40 |
| RAISE5MIN | $116 | 0 | $0 | 15 May, 09:30 |
| LOWER6SEC | $53 | 0 | $1 | 15 May, 15:00 |
| LOWER5MIN | $30 | 0 | $0 | 15 May, 15:00 |
| Total | $18,629 | |||
Cost = VIC RRP × cleared MW per 5-min interval.
| Service | Cost | Spikes | Peak | When |
|---|---|---|---|---|
| LOWERREG | $4,479 | 0 | $16 | 15 May, 14:30 |
| RAISEREG | $3,519 | 0 | $15 | 15 May, 16:10 |
| RAISE6SEC | $158 | 0 | $0 | 15 May, 07:15 |
| RAISE60SEC | $134 | 0 | $0 | 15 May, 07:15 |
| LOWER60SEC | $110 | 0 | $1 | 15 May, 14:40 |
| LOWER6SEC | $46 | 0 | $1 | 15 May, 15:00 |
| LOWER5MIN | $37 | 0 | $0 | 15 May, 15:00 |
| RAISE5MIN | $36 | 0 | $0 | 15 May, 09:30 |
| Total | $8,520 | |||
Cost = SA RRP × cleared MW per 5-min interval.
| Service | Cost | Spikes | Peak | When |
|---|---|---|---|---|
| RAISEREG | $10,967 | 0 | $9 | 16 May, 00:35 |
| LOWER6SEC | $4,311 | 0 | $3 | 15 May, 16:35 |
| LOWERREG | $3,826 | 0 | $4 | 15 May, 08:50 |
| RAISE6SEC | $3,204 | 0 | $5 | 15 May, 07:55 |
| RAISE60SEC | $1,634 | 0 | $3 | 15 May, 06:35 |
| LOWER60SEC | $1,195 | 0 | $1 | 15 May, 14:40 |
| RAISE5MIN | $212 | 0 | $0 | 15 May, 04:15 |
| LOWER5MIN | $98 | 0 | $0 | 15 May, 15:00 |
| Total | $25,447 | |||
Cost = TAS RRP × cleared MW per 5-min interval.
Battery dispatch
Discharged
3,741MWh
peak 770 MW · 18:00
Charged
6,251MWh
peak 1,130 MW
Net
-2,510MWh
discharge − charge
Round-trip
60%
discharge / charge ratio
Discharged
4,306MWh
peak 955 MW · 18:00
Charged
5,884MWh
peak 1,089 MW
Net
-1,579MWh
discharge − charge
Round-trip
73%
discharge / charge ratio
Discharged
3,929MWh
peak 851 MW · 18:00
Charged
4,734MWh
peak 988 MW
Net
-805MWh
discharge − charge
Round-trip
83%
discharge / charge ratio
Discharged
1,461MWh
peak 293 MW · 18:30
Charged
1,867MWh
peak 408 MW
Net
-406MWh
discharge − charge
Round-trip
78%
discharge / charge ratio
NEM-wide
Discharged
13,437MWh
peak 2,830 MW · 18:00
Charged
18,736MWh
peak 2,789 MW
Net
-5,299MWh
discharge − charge
Round-trip
72%
discharge / charge ratio
Interconnectors
| Region (proxy) | Net flow | Direction changes | Hours at limit |
|---|---|---|---|
| N-Q-MNSP1 | +7.6 GWh | 26 | — |
| NSW1-QLD1 | −30.8 GWh | 8 | — |
| VIC1-NSW1 | +28.4 GWh | 12 | — |
| V-SA | +6.6 GWh | 21 | — |
| T-V-MNSP1 | −7.4 GWh | 0 | — |
Per-region net of NETINTERCHANGE proxied to a representative interconnector. Full per-interconnector decomposition + hours-at-limit needs DINTERCONNECTOR parsing (follow-up).
Emissions
Total emissions
291.8k tCO₂
▲ 2.2% vs same day last week
Intensity by region
| NSW | 109.9k tCO₂ | 0.561 tCO₂/MWh |
| QLD | 88.6k tCO₂ | 0.485 tCO₂/MWh |
| SA | 1.1k tCO₂ | 0.022 tCO₂/MWh |
| VIC | 92.3k tCO₂ | 0.588 tCO₂/MWh |
| TAS | 0 tCO₂ | 0.000 tCO₂/MWh |