NEM
MINIMUM SYSTEM LOAD
#145935
Actual Minimum System Load MSL1 condition in the SA Region on 31/10/2026
AEMO ELECTRICITY MARKET NOTICE Professionals Australia members are currently engaged in Protected Industrial Action in support of fair wages and conditions. As a result of this action there may be intermittent disruption to some services. Professionals Australia members remain committed to the safe operation of the network. We hope for a quick resolution to negotiations and the resumption of normal operations. Actual Minimum System Load MSL1 condition in the SA Region on 31/10/2026 Update to Market Notice 145903 - AEMO has detected that there is an elevated risk of insufficient demand to maintain a secure operating state in the SA on 31/10/2026. The advisory MSL thresholds are: - MSL1: -43 MW - MSL2: -253 MW - MSL3: -534 MW The demand is below the MSL1 threshold. Demand refers to Operational Demand that excludes contribution from Significant Non-Scheduled Generation: see definitions at https://aemo.com.au/energy-systems/electricity/national-electricity-market-nem/data-nem/operational-demand-data . Manager NEM Real Time Operations